Residential excavation
Residential Excavation in Vancouver, WA
Single-family and multi-family excavation for residential builders and homeowners. Digging, grading and utility groundwork, handled by a crew that runs itself.
01The job
Residential excavation for production and custom builders
The dirt crew sets the pace for everyone after it. On a production job, if the pads are off or the utilities aren’t in, framing waits, and so does every trade behind it.
We dig foundations and basements, cut building pads, run utility groundwork and grade lots on single-family and multi-family projects across Clark County and the Portland metro. The same long-term crew works lot after lot, so the standard on the fortieth lot is the standard on the first.
Production lots, start to finish
02What’s included
What’s included in residential excavation
From first dig to final grade, in the order the work happens on site. Hire us for one step or the whole list.
Homesite development
Raw lots cleared and opened up for construction.
Building pads
Cut and fill to elevation, ready to build on.
Foundations & basements
Dug to plan and checked against grade before the forms go in.
Utility groundwork
Trenching and site utilities run to each home.
Retaining walls
Rock and block walls where the grade needs holding.
Rough & finish grade
Lots shaped to drain and handed off clean.
Production work
Watch the crew work a production site.
03How we run it
How a residential job runs with LPG
You hand off the dirtwork. We handle it.
- 01
Talk through the project
We get clear on scope and give you a straight answer on what it will cost.
- 02
We run the work
We handle admin, coordinate with your team and keep you updated, so you’re never chasing us for an answer.
- 03
Ready for the next trade
Close out knowing the work was done right, on time and on budget.
?Straight answers
Residential excavation questions
All FAQs →Can you help with site preparation for new home construction?
Yes. We offer site preparation that supports new residential construction, including grading, excavation and utility-related groundwork.
Do you work with builders and homeowners?
Yes. We serve residential builders as well as homeowners who need excavation, grading and site utility work.
What types of residential sites do you work on?
We work on both single-family and multi-family residential projects, from one custom home to production work across a subdivision.
Can one crew handle the excavation and the utilities?
Yes. Underground utility work is one of our core specialties alongside excavation and grading, so the dirtwork and utility groundwork for a new home can stay with one crew.
?Before You Dig
Questions people ask before this work starts
Local answers on permits, soil, rain and bids, each with the rule it comes from.
-
Bids & hiring
How Do I Check an Excavation Contractor’s License?
For homeowners and builders5 min read
-
Bids & hiring
Why Are My Excavation Bids So Far Apart?
For homeowners and builders5 min read
-
Rain & stormwater
Does a New House Need a Stormwater Plan?
For homeowners and builders5 min read
-
Slopes, soil & drainage
Where Can Water Legally Go After I Regrade?
For homeowners and builders5 min read
-
Slopes, soil & drainage
Why Does My Yard Flood, and Will Grading Fix It?
For homeowners5 min read
Related services
→Start a project
Tell us about the site.
A few quick clicks and the right person gets back to you. Rather talk now? Call the office.
- Yard & office
- 7319 NE 37th Ave, Suite C
Vancouver, WA 98665 - Hours
- Mon–Fri 7am–3pm
Sat 7am–12pm