About LPG
About Lindberg Pipe & Grade
A Vancouver, WA excavation and underground utilities company. Serving builders, general contractors and homeowners across Southwest Washington and the Portland metro since 2008.
Field and office, one crew since 2008
01Our story
An excavation sub GCs never have to manage
Lindberg Pipe & Grade is a full-service excavation and underground utilities company, working out of our yard in Vancouver, WA on residential, custom and commercial sites across Clark County and the Portland metro.
We know the kind of general contractor you want to be: the one who delivers clean jobs and keeps getting called back. That only works when every sub on your site runs itself. Most excavation subs need more oversight than they’re worth, and when they slip, it’s your reputation on the line, not theirs.
“Hand off the civil scope and we take it from there.”
For the last 18 years that’s been the job: help general contractors, builders and homeowners close out clean sites, on time and on budget, without the babysitting.
- The crew staysOur crew has been with us for years.
- One standardYour first job with us or your fiftieth, same attention.
- Straight numbersBids that reflect what the job calls for.
Watch
Meet the LPG crew.
Two minutes with the people who run the office, the machines and the job sites.
What we stand for
Fair. Consistent. Reliable.
Fair
Fair terms, clear pricing and customer-focused solutions.
Consistent
Experienced crew and high standards on every project.
Reliable
We always show up and proactively communicate.
Licensed, bonded & insured
Licensed in Washington and Oregon.
Lindberg Pipe and Grade Inc. is a fully licensed, bonded and insured excavation contractor.
- Washington contractor licenseLINDBPG921OE
- Oregon CCB licenseCCB-183853
- USDOT number1797155
Associations
Member of local industry associations
Member in good standing
Active member
Pacific Northwest Chapter
Our family of companies
Our sister companies: Natrix Precast and Natrix Materials
Block and concrete, made down the road. LPG is part of a family of Vancouver companies. When your project needs retaining wall block or concrete, it comes from people we work with every day.
Makes Verti-Block precast retaining walls in Vancouver, WA, with 3D wall design and estimating.
Visit Natrix Precast ↗ Natrix MaterialsFresh volumetric concrete, mixed on site in the exact yardage you need. No short-load fees.
Visit Natrix Materials ↗Let’s talk about your project.
Call (360) 213-1828 or send us the details.