Short answer
Regrading fixes water that sits on top of the ground and has somewhere lower to go. Washington’s residential code calls for the grade to fall at least 6 inches in the first 10 feet from the foundation. If the soil is poorly drained or the water has no way out, you need a drain too.
What usually causes a yard to flood here?
Most yard flooding in Vancouver and Clark County comes from one of five causes. Often two of them work together.
- The ground tips toward the house. Rain runs to the foundation and sits there.
- There is a low spot. Water collects in the dip and has no way out.
- Downspouts dump next to the house. A roof sheds a lot of water in one place.
- The soil drains slowly. Clay and tight silt hold water near the top.
- Groundwater is high in winter. The ground is already full, so new rain stays on top.
The first three are surface problems. The last two are soil problems. Which kind you have decides the fix.
What slope should the ground have next to my house?
The ground should fall at least 6 inches in the first 10 feet away from the foundation. That is the rule in Section R401.3 of the Washington State Residential Code, as of November 2026. Washington has adopted the 2021 International Residential Code with state changes, and it did not change this section.
The code has a backup for tight lots. Where lot lines, walls or slopes block that fall, drains or swales must carry water away from the house. A swale is a shallow, wide ditch.
Hard surfaces have a number too. Paving within 10 feet of the foundation must slope at least 2 percent away from the building.
This rule is written for new construction. For an older house it is still a good target. Codes change, so confirm with the City of Vancouver or the Clark County Permit Center before permitted work.
Is my soil part of the problem?
It can be, and you can look it up for free. The federal soil survey maps the soil on every lot in Clark County. It rates each soil for how well it drains.
The ratings vary a lot across the county. The survey rates Cove silty clay loam and Odne silt loam as poorly drained. It rates Gee silt loam as moderately well drained. It rates Hillsboro silt loam and Lauren gravelly loam as well drained.
To check your lot, open the USDA Web Soil Survey and search your address. Read the soil name and its drainage class. The Environmental map in Clark County MapsOnline has a Soils and Wetlands Inventory layer as well.
A map is a starting point. Many home lots were cut, filled and packed when the house was built. The soil in your yard may not match the map.
When does regrading alone fix it?
Regrading alone works when the water is on the surface and there is a lower place for it to go on your lot. Grading means reshaping the ground so water runs where you want.
Good signs that grading will do it:
- Water pools against the house, and the yard beyond is lower.
- A dip holds water, and the ground past it falls away.
- The puddle shows up in a hard rain and is gone in a day or so.
- The trouble started after a patio, a shed or new fill changed the yard.
Fix the downspouts first. Carry roof water away from the foundation and watch the next storm. That one change sometimes solves the problem.
When do I need a drain or a storm connection?
You need more than grading when the water has no way out or comes from below. A drain gives it a path.
Signs that grading will not be enough:
- The lot is flat, or the low spot is the lowest point around.
- The ground stays soggy for days after the rain stops.
- Water seeps up in winter even when it has not rained hard.
- Your soil is rated poorly drained.
- A fence line, wall or neighbor’s higher lot blocks the fall the code wants.
The fix may be a swale, a buried drain pipe or a catch basin. A buried drain in slow soil still needs an outlet. Without one, it is only a wet trench.
The outlet is where people get in trouble. You cannot aim a pipe at the neighbor’s yard. A tie to the public storm system needs an answer from the city or county first. Read where drainage water can legally go before you pick one.
Do I need a permit to regrade my yard?
It depends on how much dirt you move and where the lot is. Work near a steep slope or another critical area gets extra review.
The city and the county use different rules. See grading permits in Vancouver for the thresholds. Other cities in Clark County run their own permits.
Timing matters too. Bare soil washes away fast in the wet months. Our article on excavation in the rainy season explains why. Finish grading is part of our residential excavation work.
When you get bids, ask each contractor where the water will end up. Get the outlet written into the bid.
Do this now
- Go outside in a hard rain and take photos of where water comes from and where it sits.
- Check every downspout. Move the water away from the foundation and watch the next storm.
- Measure the slope by the house with a level and a tape. Look for 6 inches of fall in 10 feet.
- Look up your soil’s drainage class on the USDA Web Soil Survey.
- Before any digging, have utility locates requested through 811, and find the lines you own yourself.
More questions
Will a buried drain work in clay soil?
It can, but slowly, because water moves through clay slowly. It also needs a legal outlet that is lower than the drain.
When is the best time to find the cause?
Winter. Watch the yard during and after a hard rain, when the ground is already wet. Summer hides most drainage problems.
Does 811 mark my sprinkler and yard drain lines?
Usually not. Utility companies generally mark their own lines only up to the meter or connection point. See does 811 mark private lines.
Sources
- 2021 Washington State Residential Code, Chapter 4: Foundations, Section R401.3 (read November 23, 2026)
- USDA Natural Resources Conservation Service: Web Soil Survey (Clark County, Washington survey data read November 23, 2026)
- Clark County GIS: MapsOnline (read November 23, 2026)
Written by Lindberg Pipe & Grade, an excavation contractor in Vancouver, WA since 2008, from the agency pages and codes listed above. Rules and fees change. This is general information, not legal or engineering advice, so check with the permit office for your address before work starts.

