LPG operator climbing up into a dozer at the start of the day

Careers at LPG

Excavation Jobs in Vancouver, WA

Build a career on a crew that sticks together. We’re always looking for good people for the excavation crews, the shop and the office. Steady local work out of Vancouver, WA, with a crew that’s been together for years.

01Working here

What it’s like to work at LPG

Spend your week with people you like working with. We’ve all worked with someone who drags the whole crew down. Not here. The happier the crew, the better the job goes.

We hire people who care about the construction trade and want to grow with a dedicated, safety-conscious team. Show up, work hard and own your work, and there’s room to move up, like going from pipe layer to heavy equipment operator.

  • Competitive pay
  • Health, dental & vision benefits
  • Steady local work
  • Room to grow
  • Good equipment, well kept
  • A crew that sticks around
LPG crew members in company hoodies on a job site at dusk The LPG logo on the door of a company truck Excavation crews · shop · office

02Open positions

Open positions at LPG

No open positions right now.

We’re not actively hiring at the moment, but good people are always worth hearing from. Send us your resume anyway and tell us what you do.

Send your resume

03The roles

The jobs on our crew.

What each role involves and what it takes. Tap a role to see the details.

Field · full time

Excavator Operator

At least 3 years running an excavator on residential dig-outs, sewer tie-ins, utility trenching, backfill and grading. Top pay plus benefits, based on experience.

What it takes
  • Positive attitude and equipment operating experience
  • Works well with others and can work through issues
  • Can oversee and take responsibility for a project
  • Helps train others and brings improvement ideas
  • Daily maintenance of equipment
  • Pass pre-employment and random drug screenings (includes marijuana)

A plus, not required: CDL, clean/insurable driving record, mechanical experience, training certificates (first aid, rigging card, confined space, etc.)

I’m interested

Field · full time

Pipe Layer

A key spot on the crew with real room to grow, with a future as a pipe layer or heavy equipment operator. For someone who likes the work and wants a long-term career. Competitive pay plus benefits.

What it takes
  • Willing to work in all weather and mud
  • Positive, can-do, hard-working attitude
  • Works well with others and can work through issues
  • Can take responsibility for a project
  • Your own reliable transportation to get to work on time
  • Pass pre-employment and random drug screenings (includes marijuana)

A plus, not required: CDL, clean/insurable driving record, mechanical experience, training certificates (first aid, rigging card, confined space, etc.)

I’m interested

Shop · full time

Lead Mechanic

Keep our trucks and excavation equipment running. Based out of our fully outfitted shop in Vancouver, with a service truck for field repairs. Steady local work, top wages based on experience.

What it takes
  • Scheduled maintenance on trucks and machinery
  • Heavy equipment, trucks, trailers and small machinery
  • Troubleshooting and diagnosing problems
  • Overtime for emergencies, and on-site repairs in all weather
  • A valid driver’s license (CDL is a plus)
  • 40 hours a week plus overtime as needed

A plus, not required: CDL, experience on excavation machinery (excavators, dozers), welding, small engine repair

I’m interested

Field · full time

Dump Truck Driver

Keep material moving between our job sites. Steady local work with reasonable hours. Competitive pay plus benefits, based on experience.

What it takes
  • Solo, transfer or truck-and-pup experience is a must
  • Clean, insurable driving record
  • Understands why consistent, reliable round times matter
  • Daily maintenance of equipment
  • Works well with others; helps train and brings ideas
  • Pass pre-employment and random drug screenings

A plus, not required: mechanical experience, knowing how to load excavation equipment on trailers, training certificates (first aid, rigging card, confined space, etc.)

I’m interested

Don’t see your trade? Send us your resume. We’re always glad to hear from good people for the crews, the shop and the office.

04How we work

What we expect from each other.

  • Do the right thing

    Trust, honesty and respect, from everyone who works for us and represents us.

  • Solid & dependable

    On time, flexible and good at the work. Own your mistakes and keep getting better.

  • Upbeat & positive

    Spend the week with people you enjoy. Camaraderie makes for a better job.

  • Work hard

    Give your full, steady best, no matter the job.

  • Finish strong

    Organized, focused and proud of a crisp, complete project.

?Straight answers

Applying at LPG

All FAQs →
Do I need a resume to apply?

No. Your name, phone number and a few lines about your experience is plenty. If you have a resume, attach it (PDF, Word or a photo of it).

What happens after I apply?

Your application goes straight to our hiring manager. If it looks like a fit, we’ll call you to set up a time to talk. Everyone we hire also fills out our standard employment application, which you can download here and bring to the interview.

Do you drug test?

Yes. Field positions require passing pre-employment and random drug screenings, which include marijuana.

Where is the work?

Our shop and office are at 7319 NE 37th Ave in Vancouver, WA. Job sites are across Vancouver, Clark County, Southwest Washington and the Portland metro.

→Apply

Apply to work at LPG

It takes about two minutes. Hiring or not, we want to hear from good people. Tell us who you are and attach a resume if you have one. It goes straight to our hiring manager.

Standard application
Download the PDF
Bring it to your interview
Shop & office
7319 NE 37th Ave, Suite C
Vancouver, WA 98665
What kind of work? (pick one)
Do you have a CDL? (optional)