Before You Dig · Bids & hiring

How Do I Check an Excavation Contractor’s License?

Updated For homeowners and builders5 minute read

Short answer

Look the company up on Washington L&I’s free Verify tool. It shows if the registration is active, plus the bond, insurance, workers' comp account and any lawsuits against the bond. State law sets the bond at $30,000 for a general contractor and $15,000 for a specialty contractor. This applies to anyone hiring for dirt work in Washington.

Where do I look up a contractor in Washington?

You look them up at the Washington Department of Labor & Industries, called L&I. The tool is free and it is called Verify a Contractor, Tradesperson or Business. It works the same if your lot is in Vancouver, Camas, Battle Ground or anywhere else in Clark County.

L&I says you can search three ways: by the contractor license number, by the UBI number, or by the business or owner name. The UBI is the state business license number.

The license number is the fastest search. L&I says the number must be in the contractor’s ads, and you can find it on your written bid. If a bid has no number on it, ask for one.

Want to try it? Our numbers are on this site. Type LINDBPG921OE into the search box and you will see the record for Lindberg Pipe and Grade Inc.

These rules are as of November 2026. Laws change, so confirm with L&I before you sign.

What does the lookup show?

It shows the company’s record with the state, going back six years. Open each part of the page. Here is what you will find:

  • License. The registration status, the dates it started and ends, and the type of work the company is registered for.
  • Bond. The bond on file, or a savings account used in place of a bond.
  • Insurance. The liability policy on file with the state.
  • Lawsuits against the bond. Suits filed by customers, suppliers, subs or workers.
  • L&I tax debts and license violations. Money owed to L&I and tickets L&I has written.
  • Workers' comp. If the company has an account, and about how many workers it reports.
  • Workplace safety and health. Past safety violations on its job sites.

L&I updates the database Monday through Friday by 5 a.m., except on state holidays.

What should the status say?

It should say the registration is active. A suspended registration means the company does not meet the state’s rules right now. L&I’s own note on the page lists the common causes: a canceled or expired bond or insurance, or unpaid penalties.

This matters because the bond and the registration are tied together. Under state law, when a bond is canceled the registration is suspended until a new bond is filed. So an active status tells you the bond and insurance are on file today.

Also check the name. The business name on the L&I page should match the name on your bid and your contract.

How much bond and insurance does the state require?

The bond is $30,000 for a general contractor and $15,000 for a specialty contractor. That is set in RCW 18.27.040. A general contractor is one whose jobs use more than one trade. A specialty contractor works in one trade.

The insurance minimum is in RCW 18.27.050. It is $50,000 for damage to property, $100,000 for injury to one person, and $200,000 for injury to more than one person.

These are small numbers next to the cost of a house. They are the floor to be registered. Ask the contractor for a certificate of insurance so you can see what they carry.

What does the bond not cover?

The bond does not cover just your job. It covers every job the contractor does, and other people can claim against it too. Workers, suppliers and the state can all file claims.

The law also puts limits on it. No more than half of the bond can be paid to people who are not homeowners. A homeowner who sues on the bond must file within two years of the date the work was mostly done or was abandoned.

So read the lawsuits part of the lookup with care. A bond with several open suits against it may have little left.

Does the contractor need workers' comp?

Yes, if the contractor has workers on your job. L&I’s Hire Smart guide says a contractor with employees on your site must have a workers' comp account that is active and up to date.

L&I also warns that you could be at financial risk if someone is hurt on your project and you never checked. A contractor with no employees, like an owner who works alone, does not need an account.

Excavation takes a crew. If three people show up to dig and the lookup shows no workers' comp account, ask why before work starts.

What if the work is in Oregon?

Oregon and Portland have their own rules. Work there needs an Oregon CCB license, and you can check one on the Oregon CCB license search. Ours is CCB 183853.

Once the license checks out, the next job is to compare the bids line by line. If you are a builder checking a sub, see what a GC should ask an excavation sub for. Our residential excavation page lists the work we do for builders and homeowners.

Do this now

  1. Find the contractor registration number on the bid, the truck or the website. If you cannot find one, ask for it.
  2. Search that number on L&I’s Verify tool. Check that the business name matches your bid.
  3. Read the status, the bond, the insurance and the lawsuits against the bond.
  4. Open the workers' comp part. A company with a crew should have an active account.
  5. Print or save the page with the date, and keep it with your contract.

More questions

Does an active registration mean the contractor does good work?

No. It means the company is registered, bonded and insured with the state. L&I says to also check references and, if you can, go see the contractor’s work.

Can I call L&I instead of using the website?

Yes. The Verify page lists L&I Contractor Registration at 1-800-647-0982.

How far back does the record go?

The Verify page shows bond, insurance, lawsuits and violations for the previous six years.

Sources

Written by Lindberg Pipe & Grade, an excavation contractor in Vancouver, WA since 2008, from the agency pages and codes listed above. Rules and fees change. This is general information, not legal or engineering advice, so check with the permit office for your address before work starts.

→Start a project

Have a site to talk through?

Send the address and what you want built. We’ll look at it and tell you what the dirt work involves.