LPG dozer working a cleared site at sunset

Excavating contractor in Vancouver, WA An Excavation Contractor You Don’t Have to Manage

We handle dirtwork, utilities, and retaining walls from start to finish.

01Who we are

A Vancouver excavation crew that’s been moving dirt since 2008.

Lindberg Pipe & Grade digs foundations, lays pipe, grades sites and builds retaining walls across Southwest Washington and the Portland metro.

We work for general contractors, production builders and homeowners, and most of what we know came from doing the same work, the right way, thousands of times. The crew has been with us for years. The office plans the work so the machines show up when the schedule says they will. And when something on site doesn’t match the plans, you hear about it from us first.

  • 2008Founded in Vancouver
  • 3,500+Excavation projects
  • 18+Years in the PNW
  • WA & ORLicensed & bonded
LPG crew going over the plan beside a Deere 135G excavator LPG crew member setting pipe in a trench The LPG office building the crew and equipment schedule

02What we do

Excavation services, from raw ground to ready to build.

Every site starts the same way: trees, dirt and a set of plans. Here’s what happens between that and the day the next trade shows up. Hire us for one step or hand us all five.

  1. Aerial view of an LPG dozer and excavator clearing a wooded lot

    Clear

    Land clearing and light demolition. We open the site up and take out what has to go.

    Site prep & clearing
  2. LPG excavator digging a building pad in a new subdivision

    Dig

    Foundations, basements, building pads, cut and fill. Dug to the plans and checked against grade.

    Excavation
  3. LPG crew member laying pipe in an open trench

    Pipe

    Trenching and site utilities, laid and backfilled. It’s the “pipe” in our name.

    Underground utilities
  4. LPG dozer pushing a pass of finish grade

    Grade

    Rough and finish grade, so the next trade walks onto a site that’s actually ready.

    Grading
  5. LPG crew setting retaining wall units with an excavator

    Wall

    Rock and retaining walls, set by the same crew that cut the slope behind them.

    Retaining walls
Two LPG crew members in company hoodies walking out to the excavator and dozer at sunrise
Same crew. Same standard. Every job.

04Why it works

Why builders keep calling us back.

Most excavation subs need more oversight than they’re worth. When they slip, it’s the GC’s reputation on the line, not theirs. We built LPG to be the opposite.

  • We run ourselves

    Hand us the civil scope and we take it from there: admin, coordination with your team, and updates before you have to ask.

  • The crew stays

    Our crew has been with us for years. Every project gets an experienced team and the same standard, whether it’s your first job with us or your fiftieth.

  • Straight numbers

    Our bids reflect what the job actually calls for. No padding, no surprises, fair terms.

WashingtonLINDBPG921OE Oregon CCB183853 USDOT1797155

05Watch

Videos of LPG at work

Shot on our own job sites. Each film loads only when you press play.

Out on the land

Clearing, grading and custom home sites, from first light to dusk.

The 30-second version

Dirt, pipe, iron and the people running it.

06On the job

Recent job photos

See our work
Finished grade and stone wall below a custom hillside home, with LPG's excavator on site
Custom home, hillside lot
Excavator cutting a building pad beside a new subdivision
Subdivision pad excavation
Retaining wall units staged and set along a cut slope
Retaining wall install
Long-reach excavator and crew working a deep cut on an urban lot
Deep cut, tight urban lot
Two excavators working a rocky hillside below a block wall
Rock and slope work
Volvo and Deere excavators cutting a site while the crew checks grade
Site cut with the crew on grade

07After the job

What clients say

“True dirt artists. Went the extra mile and came in under bid.”

They totally changed the landscape of our property. True dirt artists. Very professional, went the extra mile, and came in under bid. We will definitely use them again.

Brady F.

I have used LPG several times and have been amazed every time. Very fair, professional, and efficient. I would definitely use them again.

Jaren K.

We had a great experience every step of the way. They came out quickly, communicated well, and did a great job. We were very impressed and would highly recommend you call them.

Brittany G.

Part of the local industry

Members of the associations that build Southwest Washington

  • Building Industry Association of Clark CountyMember in good standing
  • Southwest Washington Contractors AssociationActive member
  • American Public Works AssociationPacific Northwest Chapter
LPG's Deere 135G excavator setting units for a retaining wall

Rock & retaining walls

Retaining walls built by the crew that cut the slope.

We build rock and retaining walls on commercial and residential projects. Because we’re an excavation company first, the same crew handles the cut, the base, the drainage, setting the wall and the backfill. One system we install a lot is Verti-Block, made in Vancouver by our sister company, Natrix Precast.

Need concrete on the same job? Natrix Materials mixes it fresh on site.

?Straight answers

Excavation questions we hear a lot

Don’t see yours? Call (360) 213-1828.

All FAQs →
What does Lindberg Pipe & Grade do?

We’re an excavation and underground utilities contractor based in Vancouver, WA. We do residential and commercial excavation, grading, underground utility work, homesite development, land clearing, light demolition and rock and retaining wall installation.

Where do you work?

Vancouver, Clark County and the greater Portland metro area, with projects across Southwest Washington and Oregon.

Do you work for general contractors, builders and homeowners?

Yes, all three. We subcontract the civil scope for commercial GCs, do production work for residential builders and subdivisions, and work directly with homeowners on new homes, additions and slopes.

Can one crew handle the dirt, the utilities and the walls?

Yes. Excavation, grading, underground utilities and retaining walls can all stay with one crew, which means fewer handoffs on your site.

Are you licensed and insured?

Yes. Lindberg Pipe and Grade Inc. is fully licensed, bonded and insured: WA Contractor License #LINDBPG921OE, Oregon CCB #CCB-183853 and USDOT #1797155.

→Start a project

Tell us about the site.

A few quick clicks tell us what you’re building and where. We’ll talk through the project, get clear on scope, and give you a straight answer on what it will cost.

Hours
Mon–Fri 7am–3pm
Sat 7am–12pm · Sun closed