Before You Dig · Slopes, soil & drainage

Where Can Water Legally Go After I Regrade?

Updated For homeowners and builders5 minute read

Short answer

Keep the water on your own lot, or send it to an outlet the city or county accepts. In a 1999 Clark County case, the Washington Supreme Court said owners may not collect water and discharge it onto a neighbor. They must also use due care. This is general information, not legal advice.

Can I send runoff onto my neighbor’s lot?

Not by collecting it and aiming it there. Washington follows the common enemy doctrine for surface water. Surface water is rain, snowmelt or spring water spread across the ground.

The basic rule lets an owner develop land even if that changes drainage for others. But the courts have added limits. The Washington Supreme Court set them out in Currens v. Sleek, decided September 9, 1999. The two lots in that case were in Clark County. One owner had clear-cut and graded her land.

The court named three limits:

  • Do not block a natural drainway. You may block spread-out surface water from coming onto your land. You may not dam a stream, gully or natural drainage channel.
  • Do not collect and discharge. You may not gather water and release it on a neighbor in greater amounts than the natural flow. You may not release it in a different manner either.
  • Use due care. The court held that owners who change the flow must act in good faith. They must avoid unnecessary damage to other property.

This is a summary of one court opinion, as of November 2026. It is not legal advice. For a real dispute, talk to a Washington attorney.

What does that mean when I regrade my yard?

It means the shape of the fix matters. A plan that changes how water leaves your lot carries more risk than one that keeps the old pattern.

These choices fit the limits the court described:

  • Let water leave the lot where it always has, spread out, not in one stream.
  • Slow it down and soak it in on your own ground where the soil allows.
  • Leave any swale or channel that carries a neighbor’s water through your lot open.

These choices invite trouble:

  • A pipe or downspout that ends at the property line.
  • A berm or fill that dams a natural channel.
  • A regrade that sends a whole yard’s water through one gap in the fence.

Not sure why the yard floods in the first place? Start with why your yard floods and whether grading fixes it.

Can I pipe water to the street or the storm drain?

Only with an answer from the city or county first. Both ban illicit connections to the public storm system. Illicit means not allowed.

In Vancouver, VMC Chapter 14.26 defines an illicit connection. It is any man-made conveyance connected to the city storm sewer without a permit. Roof drains and similar connections are left out of that definition. The safe reading is simple. Ask before you tie in.

In unincorporated Clark County, County Code 13.26A.025 covers this. A connection to the county storm sewer that breaks county stormwater standards is a prohibited discharge.

Digging in the street or planting strip is a separate question. See right-of-way permits in Vancouver. Camas, Washougal, Battle Ground, Ridgefield and La Center each have their own rules.

What water is allowed in the storm system?

Clean water only. The storm system runs to creeks, rivers and groundwater, so both codes ban anything else.

Both codes list some discharges as allowed. In Vancouver’s VMC 14.26.117, the list includes:

  • Uncontaminated water from crawl space pumps or footing drains.
  • Natural uncontaminated surface water or ground water.

Clark County’s list also includes clean water from crawl space pumps or footing drains. Each code lets the agency step in if a discharge is causing significant contamination.

Allowed water is not the same as an approved pipe. The water can be clean and the connection can still need a permit.

What do the stormwater rules say about new projects?

For projects under Vancouver’s stormwater code, natural drainage patterns must be kept. VMC 14.25.204 says discharges from the site shall occur at the natural location and elevation. That applies to the maximum extent practicable.

The same section protects the people downhill. The way runoff leaves the site must not cause adverse impact to down gradient properties. Every outfall needs energy dissipation, such as a rock pad that slows the water.

That chapter applies to new development and redevelopment. Read stormwater plans for a new house in Clark County for how that works. Lot grading is part of our residential excavation work.

Slopes change the answer again. Near a steep slope, soaking water into the ground can be banned. See building on a steep lot.

Who do I ask before I build the drain?

Ask the office that covers your address. Codes change, so confirm what you read here.

When you get bids, ask each contractor where the water will end up. Ask who gets any approval for the outlet. Get both answers written into the bid.

Do this now

  1. Watch a hard rain and sketch where water enters your lot and where it leaves.
  2. Mark any swale, ditch or pipe that carries a neighbor’s water across your yard.
  3. Decide where the water will end up before you design the regrade or the drain.
  4. Call the city or county for your address before you connect anything to a street, ditch or storm drain.
  5. Tell the neighbor downhill what you plan to do before the work starts.

More questions

Can my neighbor block water that flows from my yard?

Under the court’s rule, an owner may block spread-out surface water from coming onto their land. An owner may not block a watercourse or a natural drainway.

Is the city or county in charge of a neighbor drainage dispute?

Disputes between owners over surface water are decided under the court rules above. The city or county enforces its own stormwater code. Ask the office for your address.

Do Oregon and Portland follow the same rules?

No. Oregon and Portland have their own rules. This article covers Washington only.

Sources

Written by Lindberg Pipe & Grade, an excavation contractor in Vancouver, WA since 2008, from the agency pages and codes listed above. Rules and fees change. This is general information, not legal or engineering advice, so check with the permit office for your address before work starts.

→Start a project

Have a site to talk through?

Send the address and what you want built. We’ll look at it and tell you what the dirt work involves.