Underground utilities
Underground Utility Contractor in Vancouver, WA
Underground utility work is one of our core specialties, along with excavation and grading. It’s the “pipe” in Lindberg Pipe & Grade.
01The job
Underground utility work for residential and commercial sites
Small mistakes underground get expensive. Utility work is where a line off grade, a trench that fails inspection or a crossing nobody planned for turns into rework, and a schedule that slides.
We dig it, lay it and backfill it to plan, and we coordinate with your team so the inspection and the next trade aren’t waiting on us. Because we’re also the excavation crew, the utilities don’t become a handoff between two subs.
Dug, laid and backfilled to plan
02What’s included
What’s included: trenching, water, sewer, storm and dry utilities
Site utilities installed to plan, in the order the work happens.
Utility trenching
Excavated to depth and grade for the line going in.
Water, sewer & storm
Lines installed to the plans.
Dry utilities
Trenching for power and communications.
Service connections
Lines run and tied in to new homes.
Backfill & compaction
Trenches closed up properly so the ground stays put.
Commercial sites
Site utilities as part of the civil scope.
In the trench
Video: LPG utility crews in the trench

03How we run it
How LPG runs a utility job
Dig it, lay it, backfill it, right the first time. We’ll talk through your project, get clear on scope and give you a straight answer on what it will cost. Then we take on the work, handle admin, coordinate with your team and keep you updated throughout, so you’re never chasing us for an answer.
- An experienced, long-term crew on every job
- Honest estimates, no surprises and fair terms
- Licensed, bonded and insured in Washington and Oregon
?Straight answers
Underground utilities questions
All FAQs →Who calls 811 for utility locates before you dig?
The excavator does, so on an LPG job that responsibility is ours. In Washington and Oregon the excavator must request utility locates through 811 at least two full business days, and no more than 10, before digging (RCW 19.122.030; Oregon 811). Utility companies generally mark their lines only up to the meter or the connection point, so lines you own past that point, like a line to a shop or a sprinkler system, usually aren’t marked. Tell us about them when we talk through the job.
Can you do the utilities and the excavation on the same job?
Yes. Most of our jobs combine excavation, grading and utility work, so one crew handles the whole civil scope.
Do you work on residential and commercial sites?
Yes. We do utility work for residential builders, homeowners and commercial general contractors across Clark County and the Portland metro.
Related services
→Start a project
Tell us about the site.
A few quick clicks and the right person gets back to you. Rather talk now? Call the office.
- Yard & office
- 7319 NE 37th Ave, Suite C
Vancouver, WA 98665 - Hours
- Mon–Fri 7am–3pm
Sat 7am–12pm