Before You Dig · Clearing & site prep

Do I Need a Permit to Remove Trees on My Lot?

Updated For homeowners and builders5 minute read

Short answer

Inside Vancouver city limits, usually yes. City code requires a tree removal permit before you remove any tree, unless an exemption applies. On a lot with one home, trees under 12 inches across the trunk are usually exempt. Removing a street tree needs its own permit. In unincorporated Clark County, clearing to build falls under county forest practice rules.

Which trees need a permit in Vancouver?

Almost every tree in the city needs a permit before it comes down, unless the code exempts it. The rule is in Vancouver Municipal Code 20.450.035. It says no person may remove or destroy any tree in the city without a tree removal permit, unless the work is exempt.

This is the rule as of November 2026. The city replaced its land use code in October 2026. The old tree chapter, VMC 20.770, is now section 20.450.035. Some city web pages still show the old number. Codes change, so confirm with Vancouver Urban Forestry at 360-487-8332 before you cut.

Which trees can I remove without a permit?

On a parcel with a single home, trees under 12 inches DBH are exempt. DBH means “diameter at breast height.” It is the width of the trunk measured four and a half feet above the ground.

That exemption has two limits. It does not cover a tree the code required you to plant or keep. It does not apply in a critical area or its buffer, such as a wetland, stream or steep slope.

The code lists a few other exemptions:

  • Emergencies. Removing a tree to protect people or property from danger that is about to happen.
  • Undeveloped land. Up to six trees in any 36 months, if the parcel will stay undeveloped for six years. You must record that promise in a covenant and give the city a copy.
  • Small undeveloped parcels. Under one acre, the limit shrinks in proportion. A half acre parcel can remove three trees.

If you plan to build soon, the undeveloped land exemption does not fit you. You need a tree plan instead.

What about the tree by the street?

A street tree needs a street tree work permit, even if you take care of it. A street tree is one with its trunk fully or partly in the public right of way. Under VMC 12.04, you need the permit to plant one, remove one, or do major pruning.

You also need it to disturb the ground inside the drip line. The drip line is the edge of the branches. That matters when a new driveway or a utility trench crosses the planting strip. Minor pruning does not need a permit. The work must be done within 90 days of the permit date.

What changes when I am building on the lot?

When you develop a lot, the city reviews a tree, vegetation and soil plan with your project. The plan shows which trees stay, which go, and what gets planted. The same code section sets these rules for the plan:

  • New development must reach a tree density of 30 tree units per acre. Bigger trees count for more units. Saved trees and new trees both count.
  • Projects must be designed to keep at least 33 percent of the healthy trees that are 12 inches DBH or larger.
  • Trees that stay get a fence before clearing starts. The code calls for chain link at least four feet high.
  • No digging, parking or material storage is allowed inside that fence.

A very small job can skip the plan. That means less than 500 square feet of disturbed ground, with no tree removed and no nearby tree harmed.

Tree review ties into your other permits. See can I clear and grade before my building permit for the order things happen in. Clearing is the first step in site prep and grading, so settle the tree plan before equipment shows up.

How long does a Vancouver tree permit take?

The city says permit review may take up to 10 days. If you apply for tree removal by itself, not with a building project, the code adds a public notice. A notice goes up on the lot within seven days after your application is complete. It stays up for 14 days. Once issued, the permit is good for 180 days.

What if a tree is cut without a permit?

The fine is $1,000 per tree removed without a city permit. The code also allows stop work orders and required replanting. Each day a violation continues counts as a new violation.

What applies outside city limits in Clark County?

In unincorporated Clark County, tree cutting is handled as a forest practice, not with a city style tree permit. The rule is Clark County Code 40.260.080.

If you clear timber to turn land into a homesite, that is a conversion. The code requires an approved Class IV general forest practices permit from Clark County before that work starts. The application must describe your future development plans.

Small personal cutting is exempt. That covers removing less than 5,000 board feet of timber for personal use in any 12 months. Even then, cutting in a wetland, stream, landslide area or its buffer must follow the county critical area rules. Read SEPA and critical areas review if your lot has any of those.

There is a trap here. Logging under a state forestry permit, without a conversion approval, can put a six year development moratorium on the parcel. While it lasts, the county holds back development permits on that land unless it grants a removal or a waiver. A Class IV general permit releases you from the moratorium. So tell the county up front that you plan to build.

Camas, Washougal, Battle Ground, Ridgefield and La Center each have their own tree rules. Call that city’s permit office. Oregon and Portland have their own rules too.

Do this now

  1. Find out who governs your address. Look up the parcel on Clark County’s online maps, or call the permit office and ask.
  2. Measure each tree you want gone. Wrap a tape around the trunk four and a half feet up, then divide by 3.14 to get the diameter.
  3. Mark which trees are near the street, a creek, a wetland or a steep slope. Those have extra rules.
  4. In Vancouver, call Urban Forestry at 360-487-8332 before any cutting. In the county, call Public Works at 564-397-6118 and ask about forest practices.
  5. Ask your contractor who applies for the tree permit, and get the answer in the bid.

More questions

Do I need a permit to prune a tree in my own yard in Vancouver?

The tree removal permit covers removing or destroying a tree. Minor pruning of a street tree needs no permit, but major pruning of a street tree does.

Can I burn the trees and brush after clearing?

Not inside city limits or an urban growth area. See can I burn land clearing debris in Clark County.

What is a heritage tree?

It is a tree or grove the city has placed on its heritage tree inventory. Heritage trees are first in line to be saved on a development plan.

Sources

Written by Lindberg Pipe & Grade, an excavation contractor in Vancouver, WA since 2008, from the agency pages and codes listed above. Rules and fees change. This is general information, not legal or engineering advice, so check with the permit office for your address before work starts.

→Start a project

Have a site to talk through?

Send the address and what you want built. We’ll look at it and tell you what the dirt work involves.