Short answer
Most single-home lots skip SEPA. Clark County exempts 30 or fewer single-family homes in unincorporated urban areas, 20 in rural areas, and up to 1,000 cubic yards of stand-alone excavation. Those exemptions do not apply inside a critical area. Vancouver’s grading application calls for a SEPA checklist above 500 cubic yards.
What is SEPA?
SEPA is the State Environmental Policy Act. It makes a government agency look at the environmental effects of a project before it issues a permit.
The City of Vancouver explains the steps on its Environmental Planning page. First the agency decides if the project is “categorically exempt.” That means the project is a type small enough to skip the review.
If it is not exempt, you fill out an environmental checklist. The agency reads it and issues a determination. The city says it is usually the lead agency for private projects that need city permits.
How much grading triggers SEPA here?
It depends on who issues your permit. As of November 2026, there are three numbers to know.
The state floor. WAC 197-11-800 exempts any fill or excavation of 100 cubic yards over its lifetime. It also exempts the grading needed for an exempt building project. Cities and counties may raise those levels by ordinance.
Unincorporated Clark County. The county raised them. Clark County Code Chapter 40.570 exempts:
- 30 or fewer single-family homes in unincorporated urban areas.
- 20 or fewer homes in urban reserve and rural areas.
- Landfills and excavations up to 1,000 cubic yards that are not tied to an exempt project.
So one house on one lot is under the county’s level, and so is its grading.
City of Vancouver. The city’s grading permit application says all grading activities greater than 500 cubic yards require a SEPA checklist. The city has its own SEPA rules in the Vancouver Municipal Code. Ask Land Use Planning to confirm the exempt level for your project.
Two things cancel an exemption. The state rule does not exempt work on lands covered by water. And critical areas change the answer, as the next section shows.
Codes change. Confirm with the county or city permit office before you rely on a number. Not sure which office is yours? See Vancouver or Clark County: whose grading rules apply.
What is a critical area?
A critical area is land the state requires cities and counties to protect. The City of Vancouver regulates five types:
- Wetlands. Areas where water covers the soil or sits near the surface.
- Critical aquifer recharge areas. Ground that feeds the aquifers used for drinking water.
- Frequently flooded areas. Land that floods often.
- Geologically hazardous areas. Ground prone to erosion, landslides or earthquakes. Steep slopes fall here.
- Fish and wildlife habitat conservation areas. Land that gives fish and wildlife food, shelter or room to move.
Clark County’s code covers the same ground in its own chapters. It also treats shoreline areas as critical areas.
Here is why it matters for SEPA. The county code says its minor new construction exemptions do not apply within any critical area. That includes the 30 home and 1,000 cubic yard levels above.
In the city, the grading application says grading in or next to steep or unstable slopes, wetlands or creeks needs a Critical Areas Permit. That holds no matter the volume.
A critical area on the parcel does not mean you cannot build. The county code says it will not require a full environmental impact statement just because a project sits in a critical area. The review checks the project against the critical area rules.
Sloped lots have their own article: building on a steep lot in Clark County.
What is an archaeological predetermination?
It is a first look for buried cultural sites before you dig. Clark County’s code describes it as a review of archaeological databases, a walk across the site, and hand-dug test holes as needed. A professional archaeologist does it. The report goes to the state Department of Archaeology and Historic Preservation.
The county decides if you need one from two things. One is a statewide map that rates each area’s odds of holding a site, in five classes. The other is how much your project disturbs the ground.
The code calls a project “high impact” when it disturbs more than 12 inches below the surface and more than 10,000 square feet. For a high impact project, a predetermination is required in every map class but the lowest. The lowest class is a 1 to 20 percent probability.
Two distance rules apply on any map class:
- A high impact project within one-quarter mile of a recorded site needs one.
- A moderate or high impact project within 500 feet of a known but unregistered site needs one.
If the report calls for a full survey, or the state asks for one, a survey is required.
One more rule from the code: if human remains are found, all work stops. Local law enforcement must be told right away.
How do I check a parcel before I buy?
Start with the county’s free map tools. The city’s method works for any parcel in Clark County:
- Open the Clark County Property Information Center and search the address or parcel number.
- Under “Administrative Data,” read the Jurisdiction. That tells you whose rules apply.
- Open the “Environmental” tab. Look for Geological Hazard, Habitat and Species Impacts, Flood Hazard Area, Shoreline Designation and Wetland Inventory.
The city also points to Clark County MapsOnline to see where critical areas are mapped.
Treat the maps as a first screen. The city’s rules apply to any land that meets the definition of a critical area. The definition decides it, not the map.
If the parcel shows a flag, ask the permit office what study it would want. Ask the seller for any wetland, geotechnical or archaeology reports already done.
When you price the site prep and grading, give the excavator the flags you found. Ask which reviews the bid assumes, and get that in writing.
Do this now
- Search the parcel in the Clark County Property Information Center and write down the Jurisdiction.
- Open the Environmental tab and list every flag: slope, wetland, habitat, flood, shoreline.
- Estimate your grading in cubic yards and compare it to 500 in the city or 1,000 in the county.
- Ask the seller or agent for any existing wetland, geotechnical or archaeology reports.
- Call the permit office for that jurisdiction and ask what reviews the parcel would need before you close.
More questions
Does one new house need SEPA in unincorporated Clark County?
Usually not. The county exempts 30 or fewer single-family homes in urban areas and 20 or fewer in rural areas. The exemption does not apply within a critical area.
Is a critical areas review the same as SEPA?
No. SEPA is a state review process. Critical areas rules are local protections for wetlands, slopes, floodplain and habitat. A lot can need one, both or neither.
Do Camas, Washougal, Battle Ground, Ridgefield and La Center use these numbers?
No. Each city has its own SEPA procedures and critical area rules. Call that city’s permit office.
Sources
- Washington Administrative Code 197-11-800: Categorical exemptions (read November 23, 2026)
- Clark County Code Chapter 40.570: State Environmental Policy Act (SEPA) (read November 23, 2026)
- City of Vancouver: Environmental Planning (read November 23, 2026)
- City of Vancouver: Site Development, Grading Permit application, revised 5/05/2025 (read November 23, 2026)
Written by Lindberg Pipe & Grade, an excavation contractor in Vancouver, WA since 2008, from the agency pages and codes listed above. Rules and fees change. This is general information, not legal or engineering advice, so check with the permit office for your address before work starts.