Short answer
Not inside Vancouver, any other city, or an urban growth area. State rule WAC 173-425-040 bans land clearing burning there. In rural Clark County outside those areas, you need a written permit and a Fire Marshal inspection first. Only natural vegetation grown on the site can burn. Everywhere else, debris gets chipped, ground or hauled.
Where is burning land clearing debris banned?
It is banned inside city limits and inside urban growth areas. An urban growth area is the land around a city that is planned for city style growth. Much of it sits outside the city line, so a “county” address can still be in a no burn area.
The ban comes from state rule. WAC 173-425-040 says land clearing burning may not be allowed in any urban growth area after December 31, 2000. The rule defines land clearing burning as burning trees, stumps, shrubbery or other natural vegetation from land clearing projects.
Clark County says the same thing in plain words. Its outdoor burning page says burning yard debris or burning for land clearing is illegal within city limits and urban growth areas. This is the rule as of November 2026. Rules and maps change, so confirm with the office before you plan around a fire.
How do I know if my lot is in a no burn area?
Check your address on the burn map run by the Southwest Clean Air Agency, called SWCAA. SWCAA is the air quality agency for Clark County. Its outdoor burning page warns that no burn boundaries may not follow city limits or county lines. So do not guess from your mailing address.
You can also call SWCAA at 360-574-3058 and ask about your parcel.
Can I burn on a rural lot outside the no burn area?
Yes, but only with a written permit, and only natural vegetation from that property. Land clearing is not covered by the simple permit that homeowners use for a small yard debris pile.
In unincorporated Clark County, the Fire Marshal handles land clearing burn permits. The county page lists these steps for land clearing and for piles over 10 feet across:
- The permit has a fee and is processed online.
- You create an account in the county’s permit system and apply under Fire, Burn (BUR).
- You email firemar@clark.wa.gov with your permit number and your request.
- A Fire Marshal inspection is required before you burn.
The Fire Marshal’s number for these permits is 564-397-2186. The county page does not list the fee, so ask when you call.
What are the rules for the fire itself?
The fire must burn only natural vegetation, sit well away from buildings, and wait for the right season and weather. These are the limits the agencies publish:
- What can burn. Only natural vegetation grown on the property. SWCAA says hauling in material from another location to burn is illegal.
- What cannot burn. Lumber, pallets, trash, plastic and construction or demolition debris. State rule also bans treated wood, asphalt, rubber and petroleum products.
- Distance. Fires must not be within 50 feet of any structure. SWCAA counts decks, fences and outbuildings.
- Season. SWCAA says outdoor burning is usually allowed October through June, outside of burn bans. Summer burning is not permitted in Clark County.
- Burn bans. SWCAA can call a burn ban for poor air quality. Burn bans still apply even when you hold a permit.
- Wind. The county says not to start burn piles during east winds or when east winds are forecast.
- Burn barrels. They are illegal.
Your written permit will carry its own conditions. Keep it at the burn site.
What can I do with the debris if I cannot burn?
You have three legal choices: chip it, grind it, or haul it away. On most lots near Vancouver, those are the only choices.
- Chipping. Limbs and brush go through a chipper. The chips can stay on site as mulch or get hauled off.
- Grinding. Bigger machines grind logs, stumps and brush into mulch. This is common on larger clearing jobs.
- Hauling. Debris gets loaded into trucks and taken to a yard debris or wood recycling site. Good logs may be sold to a mill.
Stumps are the hard part. They are heavy and packed with dirt and rock, so they are harder to move or grind than brush.
Debris handling is a real part of the clearing price, so it belongs in the bid. Our site prep and grading page lists land clearing as trees, brush and stumps out, with the site opened up. With any contractor, ask where the debris goes and whether disposal is included. Get both answers in writing.
Tree cutting has its own permit rules before any of this starts. See do I need a permit to remove trees on my lot. For where clearing fits in the whole job, see what site prep includes.
What happens if I burn without a permit?
You can be cited and fined. SWCAA says being cited for illegal burning or causing a smoke nuisance can result in fines per violation or occurrence. The agencies do not post a single dollar figure, so this article does not guess at one. Burning banned materials is illegal everywhere, with or without a permit.
Oregon and Portland have their own burning rules. This article covers Clark County, Washington only.
Do this now
- Look up your address on the SWCAA burn map, or call SWCAA at 360-574-3058.
- If you are inside a city or urban growth area, drop burning from the plan and price chipping, grinding or hauling.
- If you are outside the no burn area, call the Clark County Fire Marshal at 564-397-2186 about a land clearing burn permit.
- Ask every bidder how debris will be handled and whether disposal is in the price.
- Check the burn ban status for Clark County on the day of any permitted burn.
More questions
Can I burn stumps and logs from another property on my rural land?
No. SWCAA says hauling in materials from another location for burning is illegal.
Can I burn an old shed or lumber with the brush?
No. Construction and demolition debris, lumber and treated wood are banned from outdoor burning. See tearing down a garage or shed for the demolition rules.
Is a small yard debris fire the same as land clearing burning?
No. A small pile of yard debris on a rural lot uses a simpler permit. Clearing land for a project needs the written land clearing permit and an inspection.
Sources
- Washington Administrative Code 173-425: Outdoor Burning (read November 23, 2026)
- Clark County Community Development: Outdoor burning (read November 23, 2026)
- Southwest Clean Air Agency: Outdoor Burning (read November 23, 2026)
Written by Lindberg Pipe & Grade, an excavation contractor in Vancouver, WA since 2008, from the agency pages and codes listed above. Rules and fees change. This is general information, not legal or engineering advice, so check with the permit office for your address before work starts.