Short answer
Inside Vancouver city limits, a grading permit is required for nearly all projects that move more than 10 cubic yards of earth or vegetation. A permitted house foundation dig can skip the separate permit at 50 cubic yards or less. The lot must be level and outside critical areas.
How much dirt can I move before I need a permit?
Not much. As of November 2026, the city sets the line at 10 cubic yards. Its grading FAQ says a permit is required for nearly all projects that disturb or move more than 10 cubic yards of earth or vegetation.
Ten cubic yards is small. Picture a block of soil 9 feet long, 6 feet wide and 5 feet tall.
The city lists four kinds of work that need a grading permit:
- Stand-alone cut and fill that is not tied to a structure.
- Grading you want to do before your building permit is approved.
- Grading for work that is not a building, such as parking lots, retaining walls and sport track resurfacing.
- Stockpiling soil on site, and moving that stockpile later.
“Cut” is soil you dig out. “Fill” is soil you place. Codes change, so confirm your project with the Permit Center before you start.
Does my building permit cover the digging for a house?
Sometimes. The city says a separate grading permit is not required when all seven of these conditions are met:
- The work is part of an approved residential building permit for foundation work on a new home or an addition.
- There is no structural fill. That is soil placed and packed to hold up a building.
- The excavation does not exceed 50 cubic yards.
- The site is not in a critical area.
- The site slope is less than 10 percent.
- The site has no unusual conditions on the surface or under it.
- The grading will not create retaining or surcharge conditions. Surcharge is extra weight pushing on a slope or wall.
Miss one and you need the separate grading permit.
Fifty cubic yards goes fast. A dig 30 feet by 30 feet and 18 inches deep is 50 cubic yards. The same footprint dug 8 feet deep for a basement is about 267 cubic yards.
Ask your builder or excavator for the cut and fill totals in cubic yards before the permit goes in.
What small jobs need no grading permit?
The city names two.
- Excavation for pads or footings on a single-family project. It must stay inside the approved footprint and use no structural fill. The site must be level, and the cut and fill must not exceed 50 cubic yards.
- A decorative pond outside critical areas that is less than 10 cubic yards and less than 12 inches deep.
If your job is not on that short list and moves more than 10 cubic yards, plan on a permit.
What pushes a job into a bigger review?
Three things do: volume, critical areas and hard surface.
The city’s grading permit application splits jobs into minor and major grading. Minor grading is less than 500 cubic yards of cut, fill or stockpile. Major grading is more than 500 cubic yards, and the city requires a SEPA checklist for it. SEPA is the state’s environmental review.
Critical areas are places like steep or unstable slopes, wetlands and creeks. The application says grading in or next to one needs a Critical Areas Permit, no matter the volume. Our article on SEPA and critical areas review explains both.
Hard surface is the third trigger. If you create or replace 2,000 square feet or more of hard surface, the city’s stormwater and erosion control rules apply. Then the city asks for a stormwater plan, a pollution prevention plan, a tree plan and a grading plan with erosion control.
The application also flags 7,000 square feet or more of land disturbance. At that size you fill out the city’s Stormwater Applicability form.
What do I submit with the application?
You submit a signed application and a grading plan. The city’s grading checklist says the plan must show:
- A grading approval block with cubic yards of cut, cubic yards of fill and hard surface area.
- Property lines and easements.
- Existing and proposed structures, such as buildings, fences, pools and retaining walls.
- Existing utilities.
- Existing and proposed contours. Contours are lines that show the shape of the ground.
- Erosion control measures.
- Trees and vegetation, with protection measures noted.
- Drainage and stream courses.
The plan also needs the applicant’s name and phone, the project name, the site address, the tax parcel number and the zoning.
If the site is in a critical area, the plan must also show the sensitive area lines. It must show the distance from the property line to the top and toe of slopes.
One limit catches people. The city will not approve new stormwater structures on a grading-only plan.
If you hire out the site prep and grading, ask who pulls the permit. Get the answer in the bid.
What if my address says Vancouver but I am outside city limits?
Then these rules do not apply to you. Many “Vancouver” addresses sit in unincorporated Clark County, and the county uses different numbers. See Vancouver or Clark County: whose grading rules apply.
Do this now
- Look up your address in the Clark County Property Information Center. Confirm the Jurisdiction line says Vancouver.
- Estimate your volume. Multiply length by width by depth in feet, then divide by 27 to get cubic yards.
- Open the Environmental tab for your parcel. Note any slope, wetland or flood flags.
- Check your job against the city’s seven conditions above. Mark any you cannot meet.
- Send your numbers to the city Permit Center and ask which permit you need before any soil moves.
More questions
Do I need a permit just to stockpile dirt?
Yes, if it is more than 10 cubic yards. The city lists stockpiling on site, and moving the stockpile later, as work that needs a grading permit.
Does grading for a retaining wall need a grading permit?
The city lists grading for retaining walls as work that needs a grading permit. The wall itself can have its own permit rules. See retaining wall permits in Vancouver and Clark County.
Is the 10 cubic yards cut or fill?
The city’s wording is earth or vegetation that you “disturb or move.” The application asks for cut and fill totals as separate numbers. Ask the Permit Center how it counts your job.
Sources
- City of Vancouver: Grading Projects FAQ (read November 23, 2026)
- City of Vancouver: Site Development, Grading Permit application, revised 5/05/2025 (read November 23, 2026)
- City of Vancouver: Site Development Permit (Grading) Checklist (read November 23, 2026)
Written by Lindberg Pipe & Grade, an excavation contractor in Vancouver, WA since 2008, from the agency pages and codes listed above. Rules and fees change. This is general information, not legal or engineering advice, so check with the permit office for your address before work starts.